Wirebond Workmanship: Loop or Strain Relief
Wirebond Workmanship Contents
At a height of one wire diameter from the top surface of the ball bond, the bond wire lead should be perpendicular to within 10 degrees. |
|
Courtesy Rockwell Collins
Wirebond Workmanship Contents
At a height of one wire diameter from the top surface of the ball bond, the bond wire lead should be perpendicular to within 10 degrees. |
|
Courtesy Rockwell Collins